Material Requirements Planning (MRP): Working Out What to Buy, What to Make and When
Material requirements planning (MRP) software works out what a manufacturer needs to buy and make, how much, and when, from its bills of materials, stock and demand. If you resell finished goods you probably don't need it. If you make or assemble things, here's how MRP turns product demand into a parts plan.

Material requirements planning (MRP) software works out what a manufacturer needs to buy and make, how much, and when. It takes the demand for finished products, explodes each one through its bill of materials into the parts and raw materials it needs, subtracts what is already in stock or on order, and turns the shortfall into suggested purchase and work orders, each with a due date.
This guide covers what MRP does, the signs you need it, how it differs from an ERP, and when to buy a packaged MRP versus having one built around how your shop runs.
What MRP software does
A single order shows how it works. A customer orders a batch of finished units due on a given date. The MRP looks up the product's bill of materials (BOM), the structured list of every subassembly, component and raw material that goes into one unit. Level by level, it nets each item against stock on hand and open orders, and only the shortfall is exploded to the next level. Whatever is left is a net requirement.
Next comes timing. Each item has a lead time: how long a supplier takes to deliver it, or your team takes to make it. The MRP works backward from the due date, so a subassembly that takes a week to build gets a work order that starts a week before final assembly needs it, and the components inside it get purchase orders timed to arrive before that. Lot-sizing rules decide whether it orders exactly what's needed, a fixed quantity, or a supplier's minimum.
The output is a plan: suggested purchase orders, suggested work orders, and exception messages telling planners which existing orders to expedite, push out or cancel because demand moved. MRP plans; a planner or buyer reviews the suggestions and releases them.
Who needs MRP software
If you resell finished goods, you probably don't: reorder points and a good inventory system cover a business that sells products in the form it buys them. MRP earns its place when you make or assemble things, so the demand for one product creates demand for many parts underneath it. The signs you have outgrown spreadsheets:
- Builds stop for one missing part while the shelves are full of everything else.
- Buying runs on gut feel. Buyers order extra "just in case" because nobody can see what upcoming orders will actually consume.
- Long-lead components arrive late because nobody noticed they had to be ordered before the customer order was even firm.
- The BOM lives in a spreadsheet that someone explodes by hand, and engineering changes don't reach purchasing.
- You can't answer "will we have the parts to ship this by the 15th?" without walking the floor and checking with three people.
- Expediting is routine. Rush freight and premium supplier charges are a normal line item.
Manufacturers, assemblers, contract manufacturers, food and beverage producers (where a recipe is the BOM) and brands that kit their own products all hit these. Products in the category include dedicated tools such as Katana, MRPeasy and Fishbowl, the manufacturing apps of suites like Odoo, and the MRP modules inside larger ERPs.
Core MRP features
| Feature | What it handles | Who uses it most |
|---|---|---|
| Bills of materials | Multi-level parts lists, quantities per unit, revisions, alternates | Engineering and production |
| Demand inputs | Customer orders, forecasts and the master production schedule that MRP plans against | Sales and planning |
| Inventory netting | On-hand stock, open purchase and work orders, safety stock, allocations | Planners and the warehouse |
| Material and component planning | Explodes demand through the BOM, nets it, offsets it by lead time and applies lot-sizing rules | Planners |
| Purchasing | Suggested purchase orders by supplier and due date, ready for a buyer to release | Buyers |
| Production scheduling | Suggested work orders with start and due dates; capacity checks in some products | Production managers |
| Exception messages | Which existing orders to expedite, push out or cancel when demand or supply changes | Planners and buyers |
One limit is worth knowing before you buy. Classic MRP assumes unlimited capacity: it says when work should start, not whether the machines and people are free. Some products add capacity planning or finite scheduling, so check what a product does there.
MRP is also only as good as its data. A wrong BOM, a stale lead time or a bad stock count produces a confident plan that is wrong.
MRP vs ERP
The two get confused because manufacturing ERPs include MRP as a module, and ERP grew out of it: MRP was extended into manufacturing resource planning (MRP II) with capacity planning and costing, and the suites that eventually covered the whole company became ERP.
An ERP (enterprise resource planning) is the system of record for the money and materials across a business: the general ledger, inventory, purchasing, sales orders, invoicing and payables. Its core question is "what do we have, what do we owe, and what did we earn?"
MRP is a planning engine for one part of that picture. Its core question is "what do we need to buy and make, and by when?" It reads inventory and orders, and its suggestions become purchase and work orders, but it doesn't keep the books.
Some manufacturers run a standalone MRP connected to accounting software for the ledger; others use their ERP's MRP module so planning, purchasing and finance share one database. Either way, tracking what each machine and operator is doing right now is the job of a manufacturing execution system (MES).
Off-the-shelf MRP vs a custom build
For most small and mid-size manufacturers, the right answer is to buy. BOM explosion, netting, lead-time offsetting and lot sizing are well-understood logic that packaged products have refined for decades.
| Factor | Off-the-shelf MRP | Custom-built system |
|---|---|---|
| Time to start | Faster. Load items, BOMs and lead times, then configure. | Slower. The planning rules have to be designed and built first. |
| Cost structure | Subscription, priced per seat, by tier or both, plus setup and data loading. | An upfront build cost, then hosting and maintenance. Doesn't grow per user. |
| Planning logic | Netting, lead times and lot sizing built in and maintained by the vendor. | Has to be built, tested and kept correct by you. |
| Fit to your products | You model products the way the system expects. | The system can follow how your products are actually configured and made. |
| Connecting other systems | Standard connectors for common accounting and e-commerce tools. | Integrations are designed in from the start. |
| Who wins when production is standard | Off-the-shelf. A typical assembler gets more for less by buying. | Rarely worth it. You pay to rebuild what already exists. |
Custom wins in a narrower set of cases:
- Your products don't fit the model. If each order is configured from rules that drive both the quote and the BOM, forcing it into a standard item master loses detail the plan needs.
- The plan depends on data in other systems. When demand arrives through a dealer portal, a customer's forecast feed and your store, the real problem is making those systems agree. A custom layer feeding a proven planning engine can beat replacing everything.
- Seat pricing stops making sense. When many floor staff each need light access, per-seat licenses can outgrow the value they get.
Look at a hybrid before a build from nothing: keep a packaged MRP or ERP for the planning core and build custom software around it, such as a configurator, an order portal or an integration hub. We go deeper on that trade-off in custom software vs off-the-shelf platforms, and on what drives a build's price in how much custom software development costs.
Where AI automation fits around MRP
MRP does the math well. The hours go into the work around it: reading emails, chasing suppliers and sorting exception messages. A few examples specific to MRP:
- AI can re-plan material orders when a customer order changes and show what else moves. When a customer emails to pull in a date or change a quantity, an agent reads the change, drafts the order update and runs a trial re-plan. The MRP still does the netting; the agent summarizes what shifted: which purchase orders to expedite or push out, which work orders move, and which other customer orders share the affected parts. A planner approves every change before anything is released.
- Ranking exception messages. AI can group an MRP run's reschedule suggestions by part and supplier, put the ones that threaten a ship date first, and draft the supplier note for each expedite.
- Checking supplier acknowledgments against the plan. Suppliers confirm orders by email or PDF, sometimes with a different date or quantity. An agent can read each acknowledgment, compare it to the purchase order, flag mismatches to the buyer, and suggest lead-time updates when a supplier's confirmed dates keep drifting.
- Catching BOM data problems before they plan wrong. When engineering releases a new or changed BOM, AI can check it against the item master and flag components with no supplier, no lead time or a unit of measure that doesn't match how it's bought.
The MRP stays the planning engine; the AI reads the documents, prepares the change and hands the decisions to a person. That is the kind of work we build in our AI automation practice.
How KeyesCode scopes a build like this
We start by following one order from quote to shipment and marking every place someone re-keys data or waits on an email. That map makes the choice concrete: buy an MRP, connect the systems you already have, or build the piece no product covers. When a build is the right call, we keep the books, and planning wherever a product fits, in proven systems, build the workflow-specific parts as custom software, and add AI only where a measurable chunk of manual work disappears. If the honest answer is to buy a packaged MRP, we'll say so.
Related systems in this series
Frequently asked questions
What is MRP software in simple terms?
MRP software tells a manufacturer what to buy and make, how much, and when. It takes demand for finished products, breaks each one down through its bill of materials into parts and raw materials, subtracts what is in stock or already on order, and works backward from due dates by lead time to suggest dated purchase orders and work orders for a planner or buyer to release.
What is the difference between MRP and ERP?
MRP is a planning engine: it works out what materials to buy and make, and by when. An ERP is the system of record for the whole business: the general ledger, inventory, purchasing, sales orders and invoicing. ERP grew out of MRP, and manufacturing ERPs include MRP as a module. Some manufacturers run a standalone MRP connected to accounting software instead.
Does my business need MRP software?
If you resell finished goods, probably not: reorder points and a good inventory system are enough. MRP pays off when you make or assemble products, so one order creates demand for many parts. The signs are builds stopping for one missing part, buyers ordering extra just in case, long-lead parts arriving late, and a bill of materials kept in a spreadsheet.
What is the difference between MRP and MRP II?
MRP (material requirements planning) plans materials: what to buy and make, and when. MRP II (manufacturing resource planning) extended it with capacity planning, costing and links to finance, so planners can check the plan against machine and labor capacity. The suites that grew from MRP II to cover the whole company became ERP.
Should I buy MRP software or build a custom one?
Most small and mid-size manufacturers should buy, because bill-of-materials explosion, netting, lead times and lot sizing are well-understood logic that packaged products already handle. A custom build makes sense when your products are configured from rules a standard item master can't express, when demand and supply data live in several systems that have to agree, or when per-seat pricing stops making sense.
How can AI help with material requirements planning?
AI can re-plan material orders when a customer order changes and show what else moves: it reads the change, runs a trial re-plan and summarizes which purchase orders and work orders shift and which other orders share the parts. It can also rank exception messages, check supplier acknowledgments against purchase orders, and flag bill-of-materials data gaps. The MRP still does the math, and a planner approves every change before it is released.
Thinking about your own system?
Not sure whether to buy, customize or build?
Tell us what you run today and where it falls short. We'll give you a straight answer on your best option, even if that's a product you can buy.